Granite Bay Bathroom Remodel: A 29-Year Dream Bathroom, Finally Realized (Part 1)

29 Years Later, a Granite Bay Homeowner Finally Gets the Bathroom They Always Deserved

Situated in a stately neighborhood tucked away off beautifully manicured, rose-lined avenues winding through Granite Bay, this custom-built home has been lived in and cherished by its original owners for over 29 years.

In 2006, they modified the home slightly, adding square footage to the primary suite in the form of a bathroom addition that built out a previously excluded corner of the exterior footprint.

However, over 20 years later, the homeowners felt they shortchanged themselves by limiting the bathroom footprint to the extent they did, and decided to simultaneously update their bathroom to today’s tastes and increase its size, fully bringing to life the bathroom they always envisioned.

This Granite Bay remodeling project included a full primary bathroom gut, structural beam installation, custom vanity cabinetry, and a reconfigured layout that finally gives the space the size and function it always deserved.

Let’s jump in and see what the project entailed.

Thoughtful Space Planning, Purposeful Design

The homeowners worked closely with our team to bring the vision to life.

With thoughtful space planning, we arrived at a home remodel interior design that accommodates more storage and makes better use of space, creating a much more open and functional bathroom.

Moving the existing wall between the bedroom and bathroom one foot into the bedroom allows the double sinks to share counter space, leaving ample room to the left of the entry for a dedicated dressing counter.

A full-sized linen closet and reconfigured bathtub and shower complete the project, but the star of the show will be the custom-designed and hand-stained vanity cabinets.

What’s Happening This Week on the Project

When the bathroom addition was originally constructed, the roof was adjusted, and footings were poured along the bathroom wall, which complicated matters.

Even though the proposed plan was only to move this wall one foot, the new wall would not be able to structurally support the weight of the roof and framing above without the posts and footings below currently carrying the load.

For our team at Usher Building & Design, this was easily addressed. We assessed the floor plans and, after working with our engineer, the best course of action was determined and efficiently executed.

Demolition, Temporary Walls & Structural Beam Installation

After demolishing the entire existing primary bathroom, the team constructed two new temporary stud walls on either side of the load-bearing wall so it could be safely removed.

Once this wall was out, the ceiling joists above were cut to allow for the installation of two large beams that would sit together in the ceiling above the load-bearing wall to support the weight.

The beams, each 1.75″ x 16″ MicroLam LVLs with a length of just under 20′, ensure the structural integrity of the building.

With the weight of the roof now resting on the supports and footings on either side of the new beam, the new bathroom wall can be constructed, and the two temporary walls can be safely removed.

With the new finishes and fixtures currently being installed, this bathroom is sure to be stunning. Stay tuned for the completed project update to come!

Granite Bay Remodel Floor Plan – Before

Granite Bay Remodel Floor Plan – After